Why It Looks & Feels Better People react to surfaces. PEC delivers: Earthy colour from your own soil — no blinding grey. Lower glare in...
Scroll to reading
Poured earth concrete

Why It Looks & Feels Better

People react to surfaces. PEC delivers:

  • Earthy colour from your own soil — no blinding grey.
  • Lower glare in the South Indian sun — easier on eyes, cameras and kids.
  • More comfortable feel underfoot; users notice it.
  • Design flexibility for curves, courts, shared walk‑drive zones without cutting thousands of blocks.

Where Poured Earth Concrete Fits

Use PEC for:

  • School & college campus loops
  • Gated community streets
  • Resort & retreat drives
  • Institutional campuses
  • Farm & estate approach roads

Have heavier traffic? Call us and we’ll advise the right section. For most light internal roads, PEC is the smarter choice.

Poured Earth Concrete (PEC) Road: Low-Carbon, High-Value Surface for Light-Vehicle Campuses

What is PEC (soil-cement), in one line

PEC is simply in-situ soil blended with measured cement, aggregate & water, to form a durable pavement layer—an established technique in “soil-cement” construction.

secement.org  American Cement Association

Our project scope & mix

  • Footprint: 90 m × 5 m × 0.15 m (67.5 m³ total).
  • PEC mix: 5 (jelly) : 3 (earth) : 2 (M-sand) : 1 (cement) → cement is 1/11th of volume.
  • Comparators: (i) M25 RCC slab with 80 kg steel/m³ (lightly loaded pavements), (ii) 4″ paver blocks with 10% bedding mortar.

Fact-checked embodied-impact factors used

  • Cement: ~0.93 t CO₂/t cement; ~4.7 MJ/kg embodied energy.
  • Rebar: ~1.9 t CO₂/t; ~20 MJ/kg embodied energy.
    These are consistent with widely used databases and guidance (ICE database; RICS WLCA 2023 noting ICE usage; independent industry summaries). greenbuildingencyclopaedia.ukGlobal ABCRICS
    (Context: Cement typically dominates concrete’s embodied carbon—up to ~90% of A1–A3—so cutting cement is the main lever.) Institution of Structural Engineers

Table A — Comparative Costing (Materials-Only: Cement & Steel)

(Prices you approved: cement ₹360/50 kg; steel ₹60/kg. No jelly/M-sand/labour/plant.)

Option Cement (t) Steel (t) Cement Cost (₹) Steel Cost (₹) Total (₹)
PEC (baseline) 8.84 0.00 ₹63,626 ₹0 ₹63,626
M25 RCC slab 24.30 5.40 ₹174,960 ₹324,000 ₹498,960
Pavers (cement only) 17.78 0.00 ₹128,016 ₹0 ₹128,016
  • Paver system (supply & install): Area 450 m² = 4,843.76 sqft, at ₹100/sqft → ₹484,376 (separate from the materials-only table above). (Road area and paver totals per your workings.)
Key read: Switching from M25 RCC to PEC avoids ~₹4.35 L in materials-only spend on this stretch; vs pavers’ cement content, PEC avoids ~₹0.64 L.

Table B — Materials & Impact Saved (Choosing PEC as Baseline)

Metric (A1–A3) vs M25 RCC slab vs 4″ Pavers (+10% bedding)
Cement avoided 15.46 t (64%) 8.94 t (50%)
Steel avoided 5.40 t (100%) 0.00 t (—)
CO₂ avoided 24.64 t (75%) 8.33 t (50%)
Embodied energy avoided 180,686 MJ (81%) 42,026 MJ (50%)
All PEC/M25/paver quantities, CO₂ and MJ are from your step-by-step workings; steel rate 80 kg/m³ per your assumption.

Why this matters for earth-based, sustainable construction

  • Embodied-carbon leverage: Cement reduction is the single biggest driver of A1–A3 savings in concrete systems. PEC achieves this without introducing rebar (another high-impact material). Institution of Structural Engineers
  • Appropriate tech for campuses: PEC/soil-cement is a proven, compacted layer suited to low-volume and light-vehicle roads when properly designed and cured. txltap.org
  • Practicality & speed: Local soils, fewer imported materials, and simpler placing/compaction workflows can shorten programmes (site-dependent).

Methodology & notes (transparency)

  1. Baseline & scope: PEC is the baseline; same footprint for all options; subgrade/base costs excluded for PEC and M25 per your instruction.
  2. Prices used: Cement ₹360/50 kg; Steel ₹60/kg; Pavers ₹100/sqft.
  3. Impact factors: Cement 0.93 t CO₂/t, 4.7 MJ/kg; Rebar 1.9 t CO₂/t, 20 MJ/kg—aligned with commonly referenced datasets (e.g., ICE) and shown in your workings. greenbuildingencyclopaedia.ukRICS
  4. Units: t = metric tonnes; MJ = megajoules.
  5. Applicability: Figures reflect this site and these assumptions; actual results vary with soil, cement grade, QC, and curing.

Why Work With GSL

We’ve built across Karnataka for over twenty years. When you choose PEC with us you get one accountable team.

We at GSL bring:

  • Controlled cement dosing (we show you the count upfront).
  • Proven field process tuned to Bangalore soils.
  • Transparent material reports so you see where every rupee goes.
  • Fast mobilisation across Bangalore, Karnataka & South India.

Call Or Visit

Stop over‑paying for cement‑heavy roads. See PEC in person and get a straight quote for your site.